Implemented under the National Transmission and Distribution Network Development and Efficiency Improvement Project (NTNSP), the CEB 220/132kV Switching Station in Kiridiwela features an industrial-grade access control system. Designed to enhance security, monitoring, and controlled zone entry, the installation combines advanced biometric fingerprint and RFID terminals, dedicated 12V DC uninterruptible power supply backup, and heavy-duty emergency fire exit doors.
Head Office:
16 Station Rd, Colombo 00400
Email: [email protected]
Hotline: 077 038 4444 / 0782 881 881 / 011 771 0877
Working Hours: 7 Days Open (9 AM – 5 PM)